To support the rapid development of the EVE battery production plant, our heavy-lifting team carried out the safe hoisting and installation of a 19-ton chiller unit. Working in a carefully controlled area surrounded by ongoing construction, we coordinated advanced lifting equipment to ensure the chiller was accurately placed into its designated position.