19-Ton Chiller Lifting

Play Video
Showcasing chiller lifting and placement process on-site.

To support the rapid development of the EVE battery production plant, our heavy-lifting team carried out the safe hoisting and installation of a 19-ton chiller unit. Working in a carefully controlled area surrounded by ongoing construction, we coordinated advanced lifting equipment to ensure the chiller was accurately placed into its designated position.

📍 Location

Padang Meha, Malaysia

⚙️ Equipment

Industrial Chiller

🏭 Industry
Battery Manufacturing Facility
📦 Weight
19 Tons
✅ Scope Of Work
  • Lifting and setting of 19-ton chiller
  • Rigging works in operationally tight environment
  • Close collaboration with project engineers and M&E contractors
💡 Key Highlights
  • High-accuracy positioning to align with mechanical installation requirements
  • Zero damage — strict compliance to safety and quality standards
  • On-schedule execution to maintain facility timeline