Crusher Heavy Lifting Project

Play Video
Showing of the full lifting process on-site at CIMA.

When CIMA required a safe and precise lifting operation for their 50-ton crusher, they engaged our specialized heavy machinery team. With our advanced lifting equipment and well-coordinated on-site engineering support, we carefully executed the hoisting and relocation process within a fully operational cement plant environment.

📍 Location

Cement Industries of Malaysia Berhad (CIMA)

⚙️ Equipment

Industrial Crusher

📦 Weight
50 Tons
✅ Scope Of Work
  • Lifting and handling of a 50-ton industrial crusher
  • Rigging and movement within restricted plant space
  • Full compliance with safety and engineering standards
💡 Key Highlights
  • Zero interruption to plant operations throughout the lift
  • Successfully completed under strict time and safety requirements
  • Professional coordination with CIMA’s engineering team
  • Delivering precision lifting for heavy industrial assets — safely, efficiently, and confidently.